Build in progress. Timber-framed extension. To be finished externally with quartz-zinc roof and K-rend walls, black aluminium windows and sliding doors…

Concrete now in, level shuttering as guide for the pour…

Steels now in place under the burning sun… Thanks to Dave Currell (07774 985685 or 01865 875398) for his fabrication and welding work. The two of us fitted them on site this week.

foundation brickwork – mortar dyed to match engineering bricks as they’ll be see above ground… ready for timber wall construction…

Timber frame going up…

Zinc roofing and roof lights now finished, concealed box guttering underway…